EXHIBIT ENGINEERS · ZIGONG, CHINA
Giant bubble chamber exhibit — actual physical exhibit reference photograph

Water Play

Giant bubble chamber exhibit

A full-height circular bubble frame and trough introduce soap films and surface tension through an observable activity that can be shared with nearby museum visitors.

▶ Watch the film
16 sec · Real operating video

THE PRODUCT IN MOTION

See it work.

See the actual physical reference and its demonstrated interaction. Lift the ring using the agreed handle arrangement and watch the film rise.

Video & text guide

THE ACTIVITY & MECHANISM

See a full-height soap film form

A visitor raises a ring from a circular soap-solution trough around a standing platform. The lifting motion draws a film upward, making a temporary liquid surface visible to the participant and surrounding observers. The activity offers a direct comparison between the ring's movement, film formation and the moment the film breaks.

  1. 01

    Stand

    Use the designated standing position inside the circular trough.

  2. 02

    Raise

    Lift the ring using the agreed handle arrangement and watch the film rise.

  3. 03

    Observe

    Compare the film edge and changing colors before returning the ring to its resting position.

REFERENCE & PROJECT SCOPE

Reference specifications.

Use the reference dimensions and operating information to plan the exhibit. The agreed project drawings define the supplied configuration, installation interfaces and service access.

Approx. L × W × H
1,500 × 1,300 × 2,800 mm
Exhibit theme
Water Play
Visitor activity
Stand · Raise · Observe
Reference operation
A visitor pulls the rope to raise the circular ring from the solution tray, drawing a tall bubble film around the central position.
Power & supply
Powered versions can be configured for 110/220 V AC, 50/60 Hz. Confirm the site connection and fixing schedule for this configuration before installation.
Reference construction
The QCPP14 component schedule identifies stainless-steel posts, lifting ring and guide wires. The bubble-film solution, tray lining and the grade of the exposed metal still require confirmation.
Configuration options
Appearance, interpretation language, controls and installation arrangement by project agreement
Daily operating schedule
8 hours per day
Scheduled maintenance
Every 30 days
Factory dispatch lead time
30–120 calendar days after design approval and receipt of the deposit. Transit time is additional.
Minimum custom order
One exhibit

Approximate planning estimate: 1500 × 1300 × 2800 mm (L × W × H). Four-post bubble apparatus including base, moving ring and overhead cover; adjacent exhibits and gallery theming excluded.

Reference configuration notes
Circular trough
A ring-shaped trough surrounds the standing platform.
Tall frame
The support frame provides a vertical lifting path for the circular ring.
Visitor demonstration
The source footage shows a person raising and lowering the ring.
Customisation, installation & support
01Overall layout
Confirm complete L × W × H, including supports and base, together with visitor approach and service access.
02Selected configuration
Coordinate the support frame, moving ring, trough and standing platform as one wet-interaction unit. Agree lift limits, approach space and the resting position.
03Interpretation and language
Review the learning task, control labels and final English content against the selected physical version.
04Operational plan
Clean the trough and ring, replenish the agreed solution and inspect the lifting guides, handles and fixings. Establish a spill-cleaning routine for the surrounding floor.
See the design-to-delivery process

BEFORE AN ENQUIRY

Questions & support.

24 months of complimentary spare-parts support, remote technical guidance and long-term after-sales support. Exhibit Engineers pays the shipping cost of complimentary spare parts during the 24-month support period.

Explore the support
Delivery, installation & after-sales terms
Payment
A 50% deposit is payable after the contract is signed. The remaining balance is paid after acceptance and before dispatch, so full payment is received before dispatch. Payment methods are agreed in the contract.
Packaging & transport
Metal shipping cases or multilayer wood-panel shipping cases. Transport arrangements and costs are agreed to suit the project.
Materials & painted finish
Common material options include Q235 steel, stainless steel, aluminium alloy, PVC, acrylic, engineering plastics. The combination is selected for each configuration. Marine anti-corrosion paint with a piano-gloss automotive paint finish. Applied to painted parts.
Typical power · powered versions
Standard products: 100–500 W; oversized installations: 1,000–5,000 W. Typical ranges for powered versions. Confirm the selected model and final connected load.
Product maintenance
Inspect the lifting rope, pulleys, guides, ring alignment and solution tray. Remove residue using a method compatible with the approved bubble solution and tray finish.
Installation & training
Complimentary training is available on site or remotely, according to project needs. If installation or on-site after-sales service is not included in the product price, the customer pays the actual travel expenses incurred, unless the contract provides otherwise.
Factory acceptance & handover
Mid-production and pre-dispatch checks are provided. Factory acceptance can take place in person at the factory or through acceptance videos. Installation and operating videos, written installation and operating instructions, drawings and a spare-parts list are provided.
Complimentary parts
24 months of complimentary spare-parts support, starting when the exhibit is handed over for use. Covers faults not caused by the user. User-caused or deliberate damage is excluded. Exhibit Engineers pays the shipping cost of complimentary spare parts during the 24-month support period.
Warranty & repair labour
The whole-exhibit warranty period and repair labour scope and charges are agreed in the contract.
Can we discuss a prototype or sample for a custom version?

Yes. Prototype testing and sample fabrication are available for custom projects. Discuss which functions or features you need to review for your version. The scope, cost and schedule are agreed for the project.

How prototype testing & samples work
Why does a soap film form around the rising frame?

Soap solution helps a thin liquid film persist. Surface tension pulls the film toward a smaller area; gravity, drainage, evaporation and disturbance influence how it changes and eventually breaks.

What do the images and videos show?

The gallery labels photographs, video frames, renderings and the dimension drawing. Physical footage is identified separately.

FROM CONCEPT TO TURNKEY DELIVERY

Start with a reference. Shape your version.

Share the exhibit name, intended users and a plan or description of your setting. We can work through the experience and practical scope.

START WITH YOUR IDEA

Tell us about your project.

Start with what you have: an idea, a sketch, a reference video or a procurement brief.

Review your message before opening WhatsApp. You can attach drawings or reference videos there.

SAVE YOUR PROJECT REFERENCES

Your selected exhibits.

1 · Select2 · Project3 · Verify & download

Save the exhibits you like, then choose up to 20 products for one complimentary PDF. Your saved list stays in this browser.

Start with an exhibit you like.

Choose “Save” on a product card or product page. Return here to prepare your collection.

Browse products ↗
0 / 20 selected

Need more information?

WhatsApp +86 13881436360 ↗[email protected]